HOTELI ‘BEST WESTERN’

Industry:
Public, Hotel

Location:
Located in near to the Airport

Contract Value: 560,000 Euro

Time Period: 12 months

Dimension: 12,000 square meters with more than 100 rooms

Solution:

ITE Group was contracted for following equipment and software solution:
Electrical Power Supply from the grid 20/0.4kV with total power 1250 kVA. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system.
Complete electrical system for the whole building including supply of devices and lighting system. Solution for data network including systems like fire alarm, CCTV, audio system, public evacuation, emergency lighting and Building Management System. Outdoor lighting system with parking system including lighting.

Partners:
Schneider Electric, Newton Transformer, General Electric Lighting, OMS Lighting, Side Lighting, 4Emme, Prysmian Group, 3M etc.

Result:

The customer had a fully functional hotel with all system integrated in one and ability to control lighting, HVAC and all systems through a Building Management Software

 

Key factors in success

  • High-quality of material installed

  • Direct Support from partners

  • Professional Engineering Staff

  • Design of Building Management System