New Air Control Center (ACC)

Industry:
Public

Location:
Located in principal airport of Albania

Contract Value: 1,250,000 Euro

Time Period: 8 months

Dimension: 14,000 square meters
Solution:

ITE Grup was contracted by the main contract “Gener 2” with the approval of the investor “Lockheed Martin”. The electrical project itself was very complex as it had to assure to the radar devices a 99.9999% power supply. ITE Grup worked with main contractor and design group form the investor to achieve to the best solution possible. Total power installed was 2500 kVA and ITE supplied everything related to medium and low voltage devices. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS.
Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system. Complete electrical system for the whole building including supply of devices. Solution for data network including systems like fire alarm, intrusion system, audio system, access control system and CCTV system, energy supervision system. On top a Building Management System was implemented to control and supervise different parameters on the building.

Partners:
ABB, Siemens, Pramac Genset, OMS Lighting, Side Lighting.

Result:

The project was finished on time including all documentation like as-build, certificate of products required by “Lockheed Martin” supervision group.

Key Success Factors:

  • High-quality of material installed

  • Direct Support from partners

  • Professional Engineering Staff

  • High number of employee

Back to Projects