Durrës Drainage Pumping Station

This facility has a large capacity for draining the city’s stormwater. Through nine pumps with a total capacity of 36 m³ per second, it enables water drainage, preventing flooding and ensuring quick water discharge during peak rainfall periods.

The systems implemented in this project include:

  • Busbars Busbars
  • Fire detection system Fire detection system
  • Generator Generator
  • Industrial lighting Industrial lighting
  • Power center and low-voltage distribution panels Power center and low-voltage distribution panels
  • Power supply from the 20/0.4 kV network with a capacity of 4000kVA Power supply from the 20/0.4 kV network with a capacity of 4000kVA
  • SCADA system SCADA system
  • UPS UPS
Project type
Drainage Pumping Station
Location
Durrës – Albania
Contract value
1,200,000 Euro