We were contracted for the design and execution of all electrical and the SCADA system works for the water supply network in Gjirokastër. The project included the renovation of two wells used for drinking water production, the Dunavat pumping station, the two main water reservoirs serving the city, and the installation of 32 flow meters across 17 drinking water measurement zones. All these locations are monitored and controlled through the SCADA system, including the water balance report for the DMA and production.