Murrizi Tunnel

The Murrizi Tunnel, considered the backbone of the Arbër Road, is 3.7 kilometers long.

The Murrizi Tunnel is considered the backbone of the Arbër Road and has a total length of 3.7 kilometers. It consists of two tunnels — the main tunnel for vehicle passage and an emergency tunnel with 11 access and exit points. This tunnel significantly reduces the travel time between Dibër and Tirana to just two hours.

The systems implemented in this project include:

  • CCTV CCTV
  • Evacuation system Evacuation system
  • Power supply from the 20/0.4 kV network with a capacity of 2500kVA Power supply from the 20/0.4 kV network with a capacity of 2500kVA
  • Road signage system Road signage system
  • SCADA system SCADA system
  • Tunnel lighting Tunnel lighting
  • Ventilation systems Ventilation systems
Location
Dibër, Albania
Contract value
4,000,000 Euro

Partners

ATM Lightning Logo
Bosch Logo
Eupen Logo
Norka Logo
Philips Logo
Schneider Logo
Siemens Logo
Swarco Logo
Tesar Logo

Related Projects

Lorem ipsum dolor sit amet,consectetur adipiscing elit.