Wastewater Treatment – Peja
We were contracted for the design and execution of all electrical works and the SCADA system for the wastewater treatment plant of Peja.
Our company supplied and installed all medium- and low-voltage equipment, the four motor control centers (MCCs), PLC panels, and all cabling throughout the entire plant.
The systems implemented in this project include:
-
1
-
Access control system
-
Audio System
-
CCTV
-
Fire detection system
-
Generator
-
Power supply from the 20/0.4 kV network with a capacity of 1600kVA
-
SCADA system
-
UPS
Project type
Water Treatment Plant
Location
Pej, Kosovo
Contract value
1,188,000 Euro
Partners