Elbasan Stadium Reconstruction

Industry:
Public

Location:
City Center Elbasan

Contract Value: 350,000 Euro

Time Period: 6 months
Dimension: 18,000 square meters with a capacity of 15,000 persons

Solution:

ITE Group was contracted by the Albanian Football Federation for the electrical and electronic works during the reconstruction of the stadium “Elbasan Arena”. Total power installed was 2500 kVA and ITE supplied everything related to medium and low voltage devices. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system. Complete electrical system for the whole building including supply of devices and lighting system. Company was responsible to implement lighting project for stadium. The standards were set by UEFA for HD transmission with average value of 1500 LUX. The lighting project was designed in partnership with General Electric Lighting and was challenging to achieve the request due to limitations in positioning the poles. Provided solution for data network including systems like fire alarm, intrusion system, access control system and CCTV system.

Partners:
General Electric Lighitng, Schneider, OMS Lighting, Panasonic, Side Lighting, Phoenix Contact, 3M, Global Fire.

Result:

The stadium was inspected by UEAF and categorized according to the expectation for a UEFA Category 2 Stadium.

Key Success Factors:

  • High-quality of material installed

  • Direct Support from General Electric Lighting

  • Lighting system average 1560 LUX

Back to Projects