Installation of photovoltaic plant 250 KWP.

Installation of photovoltaic plant 250 KWP.


Read more

Reconstruction of Skanderbeg Square, Tirana

ITE Group was contracted to complete all electrical works regarding the lighting system of square and the underground parking under the square. Lighting system was crucial for this project as it including the illumination for facades of buildings like Museum, Opera House, Clock Tower, Mosques, Gardens, Trees and square itself.


Read more

National Theatre of Opera and Ballet

ITE Engineering was the contactor for performing installation and supplying electrical, electronic and BMS works. The building “National Theater of Opera and Ballet” located in the center of Tirana went under a full reconstruction.


Read more

Tirana Olympic Park (TOP), Albania

The project included electrical system for venue with different arenas such as basketball, boxing, wrestling and the offices of more than 12 sports federations.


Read more

Omega Pharma

ITE was contracted by the investor to perform turnkey solution for all electrical and electronic works. ITE was responsible for developing the entire electrical project and after approval of the investor implementing it.


Read more

City Park

ITE Group was contracted for following equipment and software solution: Electrical Power Supply from the grid 20/0.4kV with total power 10,400 kVA. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system.


Read more

Underground Parking New Boulevard, Tirana

One of the firs public underground parking in the city of Tirana. ITE Grup was contracted for following equipment and software solution: Electrical Power Supply from the grid 20/0.4kV with atransformer 400 kVA. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power center (800A), electrical distribution boards, and electrical switchboard for HVAC ad mechanical system. Complete electrical system for the whole structure, supply of devices and parking management system. Solution for data network including systems like fire alarm, CCTV, Audio and access control. Control and management for the parking was provided by CUR System Technical (Germany).


Read more

New Air Control Center (ACC)

ITE Grup was contracted by the main contract “Gener 2” with the approval of the investor “Lockheed Martin”. The electrical project itself was very complex as it had to assure to the radar devices a 99.9999% power supply.


Read more

Pharmaceutical Compound “Rejsi Pharma”

ITE Group was contracted by the investor to provide a turnkey solution for all the project. In the beginning ITE Group designed the electrical project in collaboration with investor and architecture studio. After that the company was responsible for implementing the project under the supervision of the electrical engineering staff of the investor.


Read more

Stadium Loro Boroci, Shkoder, Albania

The project included a full reconstruction of the stadium and new lighting system for HD transmission of the matches.

Read more

Bank of Albania

It was very important for the End User to provide the ultimate protection and security for the building.


Read more

Elbasan Stadium Reconstruction

ITE Grup was contracted by the Albanian Football Federation for the electrical and electronic works during the reconstruction of the stadium “Elbasan Arena”. Total power installed was 2500 kVA and ITE supplied everything related to medium and low voltage devices. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system. Complete electrical system for the whole building including supply of devices and lighting system.

Read more

LED Illumination, Tirane - Rinas, Albania

ITE Grup was contracted for following equipment and software solution: Electrical Power Supply from the grid 20/0.4kV with total power 1250 kVA. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system. Complete electrical system for the whole building including supply of devices and lighting system. Solution for data network including systems like fire alarm, CCTV, audio system, public evacuation, emergency lighting and Building Management System. Outdoor lighting system with parking system including lighting.

Read more

BEST WESTERN HOTEL

ITE Group was contracted for following equipment and software solution: Electrical Power Supply from the grid 20/0.4kV with total power 1250 kVA. Supply of all main elements of the electrical room like transformer, switchgear, voltage regulator, capacitor bank and UPS. Supply and installation of main power centers electrical distribution boards, and electrical switchboard for HVAC ad mechanic system. Complete electrical system for the whole building including supply of devices and lighting system. Solution for data network including systems like fire alarm, CCTV, audio system, public evacuation, emergency lighting and Building Management System. Outdoor lighting system with parking system including lighting.

Read more